The achievementEnergy From Above requires the player to deliver a wind turbine tower and a wind turbine nacelle to two Vitas Power wind turbine construction sites in Colorado. One is located south of Pueblo and another east of Denver.
Trivia
The name 'Vitas Power' is thought to be based on that of the Danish wind turbine manufacturer Vestas.
Vitas Power is also the manufacturer of the wind turbines which can be found on Bâtisse construction areas in France.